hide show

Riga HPP

Location: Riga HPP, Salaspils rural territory, Salaspils municipality

Status: The project was comissioned in 2018

Customer: Latvijas Valsts ceļi SJSC and Latvenergo JSC

About the project: Within the framework of reconstruction works, the LNK Industries JSC executes rebuilding of the surfacing structure, change of the road equipment and reconstruction of low-voltage and rainwater sewerage networks on Riga bypass (Salaspils — Babite) 0.30–2.38 km section of the A5 motorway. The rebuilding of the hydroelectric power plant (HPP) drainage system is being executed as well – the old drainage pipe located at a depth of 6 m will be replaced with a new one, and the duplicate drainage will be filled.