Two-level crossroad across railway tracks in Klaipeda

Location: Klaipeda, Lithuania

Status: The project put into commission in 2016

About: The flyover including premises is 330 metres long, an equivalent of more than three football pitches length. The overlay structure required 550 tons of metal constructions and 3296 cubic metres of concrete to be built. Metal structures of the overlay were fabricated by subsidiaries of LATVIJAS TILTI. In order to complete the flyover project there was also a need to relocate the engineering networks that were on the site. 

Gallery